Extension Double Storey

Double Storey Extension

A Double Storey extension designed by a good architect or architectural designer adds space to the ground and first floor of your house whether its on the rear or the side. The ground floor can have all the benefits of a single storey extension but no options for roof glazing. The first floor then adds bedrooms, bathrooms, en-suites etc.

Design Considerations

These large and visible extensions need are a lot thought. The additional spaces will be the same on both floors. Making the first floor bedroom bigger might create unneeded space on the ground floor, then you have to make the roof work.
Bedrooms need to have light, ventilation and means of escape. With two stories the planning limitations have to be considered as the size and scale means it has to be designed to fit with its environment. The regulations are stricter specifically about fire escape and structure. You need to decide what you want to gain from the build, what you are willing sacrifice and how much you have to spend. Site checks should be carried out on shared boundaries, partywall, mains sewers and is it a listed building or in a conservation area.

Design options

Once you know the room sizes required, you need to know how to access and ventilate them. Then you need to make the external of the new dwelling work well with the existing house. There are limitations in the planning guide for two storey extensions as they have more impact on their surroundings. We like to work with and enhance existing areas where possible as this means less new building, cost and impact.

A double side extension will need to look subservient to the house. Typically this is done by pulling the front wall back. Clear glazing will generally not be permitted at first floor level within 7 meters of a boundary due to over looking. Getting a good balance is important. If the need for bedroom is driving the extension, you will have to make good use of the ground floor. Double rear extensions have to consider the overshadowing and loss of amenity/outlook form the neighbours if in close proximity to the boundary.

Click Here to see some built two storey extensions in Leeds Headingly, Holbeck, Pudsey, Morley, Castleford, Pontefract, Wakefield, Horsforth, Wetherby, Seacroft, Rothwell, Harehills, Dewsbury, Tadcaster, Garforth, Swillington and West Yorkshire.

Planning Permission

Double storey extension generally need planning permission as the permitted development rights only permit small sizes. There are a lot of things to consider before submitting a planning application. How it impacts the street scene, does it enhance character, does it have negative effect on the neighbours, does it effect light/privacy/amenity. These are the things the planning officer will be checking whilst making their decision.
Our design consultants will give you the best advice on how to achieve your requirements with the best chance of securing planning approval. We will prepare and submit he application on your behalf, then act as your agent talking directly with the council throughout the application.

See our full planning guide for everything you need to know before designing click here

Building Regulations

You will definitely need a building certificate from a building control body, either local authority or private building inspector. We advise gaining the planning permission before paying for the detailed building regulations drawings. Given the additional complexity of the meeting the building regulations for a two storey extension it is essential that your get the plans approved prior to commencing.

The building regulations drawings will then be submitted for a full plans check, amended if necessary and once approved they will be the standard that is built to and inspection against. Our plans will include all the necessary detail such as structure, passage of sound, disabled access, drainage, resistance to moisture, collision, impact, heat loss, ventilation, light, emergency escape and much more. These drawings will used when the building control officer inspects the build to ensure the builder is carrying out the works correctly. You can commence works 5 days from submitting to building control, this is the minimum time due to having to consult the water authority.

Building and Builders

Remember when you finally do come to build, only half of the building work will be outside.  You should plan and phase exclusion zones with your builder. With the approved drawings you can now approach builders to provide quotation and price. Check that any quotation you consider will be written up clearly and with good detail. You will need to know exactly what is priced for and any additional costs should unforeseen issues arise.

We have extensive construction knowledge along to assist you and builder throughout. Use our drawings in line with the quotation and any additional information we don’t provide such as plumbing and electrics is agreed in detail before the first fix goes in. it will be costly changing thing once the initial preparation has been built. Our help and advice doesn’t end once you have the approved plans, we will help you throughout the construction process and visit site if required.

Front Extension Building Regulations Pontefract West Yorkshire CK Architectural
Rear Double Storey extension being constructed