TAKE A LOOK AT OUR BUILDING REGULATIONS GUIDE
Updated 01/07/2026
Over the last 5 years, there have been a lot of significant changes within the Building Regulations and Building Control. With this, it will impact people differently, Homeowners extending, builders, developers, etc., all face new encounters and responsibilities. This guide serves to inform homeowners, builders and developers in Leeds and across West Yorkshire.
Building Control and Building Regulations
Building Regulations are the legal standards that set the minimum requirements for the design and construction of buildings in England and Wales. They cover important aspects such as:
- Structural stability
- Fire safety
- Energy efficiency
- Ventilation
- Accessibility
- Health and safety
These regulations ensure that buildings are safe, sustainable, and suitable for their intended use.
Building Control is the system that makes sure these regulations are followed. It involves:
- Reviewing plans and designs before construction begins
- Carrying out inspections during the building process
- Checking that the completed work meets all required standards
- Issuing approvals and completion certificates
Building Control can be carried out by either local authorities or approved private inspectors.
In summary:
Building Regulations set the rules.
Building Control enforces those rules.
Together, they ensure that building work meets required standards at every stage—from design to completion—helping to protect people, property, and the environment.
The Building Control Process in simple terms
- Prepare Building Regulations Drawings – We create the technical drawings covering structure, insulation, drainage, etc.
- Submit for Approval – Plans are submitted to Building Control for checking (Full Plans application). Building Control may give feedback or require amendments. We handle it for you as the agent.
- Notify Start of Work – Your builder notifies Building Control before work begins and takes on the role of Principal Designer and Contractor.
- Site Inspections – Inspectors visit at key stages (e.g. foundations, structure, insulation), they provide feedback and sign off on each stage.
- Completion Certificate – Issued once work is compliant—this is essential for insurance and future property sales.
We do not recommend it; however, you can forgo the full plans submission and build under a building notice, which relies purely on the builder’s knowledge and onsite inspections. This increases risk and is only suitable for very basic, low-risk, low-cost projects.
CK Architectural Leeds
Contact us today to discuss all your project needs
When do you need Building Control
- Construction of any new building, such as houses, outbuildings, etc.
- Extending buildings will generally require Building Control, which covers things like rear and side extensions, and roof extensions such as dormers.
- Alteration and conversion of buildings, such as lofts, garages and barns, and removing any structural or thermal elements.
- Installation or extension of services and fittings such as drainage connections, utility connections, solar panels, and changes to heating appliances. Windows require either FENSA-approved installers or Building Control.
- Certain changes of use also trigger Building Control, like changing the type, function or occupancy, and changing a commercial space to residential.
- Any alteration to public buildings/sites or places of work.
When you don’t need Building Control
Some low-risk buildings and structures can be done without Building Control applying the Regulations. These are typically small, temporary or non-occupied spaces such as:
Detached single-storey buildings with floor areas under 30 m², more than 1M from a boundary, without sleeping accommodation and primarily non-combustible material.
For example, a garden room, garage, or shed. Note: adding fixed heating will often trigger Building Control due to increased fire risk and potential loss of energy efficiency.
The Building Regulations Explained
Recent changes in Building Control/Regulations
Duty Holder and Principal Designer
What Consultants Are Required?
Core Consultants
- Structural Engineer (Part A – Structure)
Required for structural changes such as removing walls, designing beams, foundations, and roofs. - Energy Assessor (Part L – Conservation of Fuel & Power)
Provides SAP calculations to ensure energy efficiency targets are met, including insulation and heating performance.
In Leeds, there is a strong focus on carbon reduction. Designs should prioritise insulation, passive design, and on-site renewables. Where net-zero targets aren’t achieved, carbon offset contributions may apply.
Consultants for More Complex Projects
- Mechanical / Electrical Engineer (Parts P, F, L, O)
Designs electrical systems, heating, and ventilation strategies. - Acoustic Engineer (Part E – Sound)
Required for flats, HMOs, or commercial projects to control sound transfer. - Drainage / Civil Engineer (Part H – Drainage)
Designs foul and surface water systems and manages connections to public sewers.
In Leeds and West Yorkshire, you may also need to coordinate with Yorkshire Water for drainage approval, including build-over agreements where applicable.
- Fire Engineer (Part B – Fire Safety)
Needed for larger or complex schemes to ensure safe escape and fire protection.
For HMOs in Leeds, fire safety is strictly enforced alongside West Yorkshire Fire and Rescue Service, often requiring self-closing fire doors, compliant escape windows, and enhanced alarm systems.
Flood Risk & Site Constraints
Certain areas of Leeds (including near rivers and the city centre) fall within flood risk zones. Your project may require:
- Flood resilience measures
- Sustainable Drainage Systems (SuDS)
- Input from a drainage or civil engineer